Jerusalem Railway tunnel line project
Project Information:
Han Station – Central Station
Nation infrastructure program 108 include the extension of the A1 underground line from “Navon” Jerusalem station to two additional underground stations:
Jerusalem centre and Jerusalem Haan station.
Both stations include 4 operational line and after each station designed stabling lines. The program includes an optional extension to connect the line to the existing “Malha” Jerusalem station.
Scope of Services:
- Design management.
- Consulting for signaling communication railway operation.