Jerusalem Railway tunnel line project

Project Information:

Han Station – Central Station

Nation infrastructure program 108 include the extension of the A1 underground line from “Navon” Jerusalem station to two additional underground stations:

Jerusalem centre and Jerusalem Haan station.

Both stations include 4 operational line and after each station designed stabling lines. The program  includes an optional extension to connect the line to the existing “Malha” Jerusalem station.

Scope of Services:

  • Design management.
  • Consulting for signaling communication railway operation.